Equipment Installation

Rigging, setting, aligning, and starting up the machinery your production depends on, handled by the same team that builds the space around it.

Overview

The gap between building and machine, closed

We handle the building and the machinery as one scope to close the gap that sinks most industrial projects. Normally the building contractor stops at the slab and the equipment vendor starts at the crate, and everything in between becomes the owner's problem: pads poured in the wrong place, anchor bolts that miss the base plate, utilities stubbed a foot from where the machine needs them. One team, one scope, no gap.

From a single machine swap to a full production line, our crews plan the move, set the equipment, align it to tolerance, and support your startup.

Mechanical equipment installation
Capabilities

What our crews handle

Rigging & Setting

Planned lifts, controlled moves, and precision setting of production machinery, from dock to final position.

Precision Alignment

Laser leveling and tolerance-based alignment, so rotating and precision equipment runs the way its manufacturer intended.

Anchoring & Grouting

Anchor bolt layout, machine bases, grouting, and shimming that hold alignment under real operating loads.

Equipment Foundations

Machine pads and isolated foundations designed and poured for the specific equipment they will carry, vibration and all.

Plant & Line Relocations

In-plant moves and full line relocations, sequenced to keep as much of your production running as possible while the move happens.

Startup Support

Coordination with your OEM technicians through commissioning, so mechanical completion turns into actual production.

Downtime Discipline

Every hour offline is priced into the plan

Equipment work is scheduled against a different clock: the cost of your line standing still. We plan installations and relocations backward from that number, staging everything possible before the shutdown, running long shifts inside the window, and proving the plan against the schedule before anyone touches a machine.

  • Move plans sequenced around production windows
  • Pre-staging and dry runs before shutdown begins
  • Utilities coordinated and verified in advance
  • A firm plan for putting things back if anything goes sideways
Conveyor line inside a production facility
FAQ

Questions, answered

That is the discipline this work demands, and we plan for it specifically. Everything that can happen before the window does: pads poured, anchors set, utilities stubbed, rigging staged. The shutdown itself is reserved for the move, the set, and the alignment, with the schedule proven on paper before the line stops.
Yes, routinely. Many machines require OEM supervision for final commissioning and warranty coverage. Our crews handle the rigging, setting, alignment, and mechanical installation, then support the OEM technicians through startup, so nobody stands around waiting on anybody.
We take single-machine swaps and full line relocations, and we will tell you upfront if a job calls for capabilities we do not carry, such as specialized heavy-haul transport. In that case we will help you plan around the right specialist rather than improvise.
That is the point of hiring one team for both. Slab cuts, reinforced pads, steel supports, wall openings, and utility rough-ins are construction work we self-perform, coordinated to the same schedule as the machine set.

Machinery on order, or a line that needs to move?

Get us involved before it ships. The best installations are planned while the equipment is still on the drawing.